The Issue: “We’re getting assemblies back with fit problems we can’t trace”
The Fix: We Built It, So We Own It.
When the same shop machines every component and assembles the finished unit, dimensional fit problems get caught at the bench — not on your line. We know exactly how each part was made because we made it.
The Issue: “Our assembler is working off three different packing lists”
The Fix: One Shipment. Complete.
Every assembly ships as a single line item with one documentation package — dimensional reports, material certs, and traceability for every component inside the box. Your receiving dock doesn’t have to sort it out.
The Issue: “We don’t have space to hold sub-assembly inventory”
The Fix: We Hold It Until You Need It.
Our Kanban program manages finished assembly stock at our facility. We stage and hold to your pull schedule — you call it off when your line needs it, not before.